Skip to content
The Old Gotthard Tunnel Route - Driver's Eye View poster
20181h 52mUnited Kingdom

The Old Gotthard Tunnel Route - Driver's Eye View

Synopsis

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…

Play Movie

Trailers, Teasers & Extra Featurettes

Official promotional previews, behind-the-scenes footage, and exclusive clips.

The Old Gotthard Tunnel Route Driver's eye view PREVIEW

Type: Trailer • Published 2018-10-01

Release History & Theatrical Window

4K UHD / Blu-ray Debut

October 1, 2018

Physical Home Media

Key Information & Fast Facts

Director
—
Screenplay & Story
Peter Middleton
Original Title
The Old Gotthard Tunnel Route - Driver's Eye View
Country of Origin
United Kingdom
Spoken Languages
English
Runtime
1h 52m
Production Studios
Video 125

Creative Leadership & Key Crew

Screenplay & Story

Peter Middleton

Producers

Peter Middleton

Department Leadership Roster

Peter Middleton

Writer

Peter Middleton

Producer

Official cinematic photography and background stills for The Old Gotthard Tunnel Route - Driver's Eye View.

More Like The Old Gotthard Tunnel Route - Driver's Eye View

Recommended titles matching themes, cast, and genres.

7.0
8.0
7.2
6.1
7.2
7.4
7.1
6.7
6.8
7.4
7.2
7.1

Frequently Asked Questions About The Old Gotthard Tunnel Route - Driver's Eye View

Quick factual answers about cast, synopsis, director, box office, and release information.

What is The Old Gotthard Tunnel Route - Driver's Eye View about?

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…

Who directed The Old Gotthard Tunnel Route - Driver's Eye View?

The Old Gotthard Tunnel Route - Driver's Eye View was directed by Not specified.

Who stars in The Old Gotthard Tunnel Route - Driver's Eye View?

The principal cast of The Old Gotthard Tunnel Route - Driver's Eye View includes Jonathan Kydd.

When was The Old Gotthard Tunnel Route - Driver's Eye View released and how long is it?

The Old Gotthard Tunnel Route - Driver's Eye View was released in 2018 with a total runtime of 1h 52m.