
The Old Gotthard Tunnel Route - Driver's Eye View
Synopsis
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Trailers, Teasers & Extra Featurettes
Official promotional previews, behind-the-scenes footage, and exclusive clips.
The Old Gotthard Tunnel Route Driver's eye view PREVIEW
Type: Trailer • Published 2018-10-01
Top Cast
Explore Star Directory →Release History & Theatrical Window
October 1, 2018
Physical Home Media
Key Information & Fast Facts
- Director
- —
- Screenplay & Story
- Peter Middleton
- Original Title
- The Old Gotthard Tunnel Route - Driver's Eye View
- Country of Origin
- United Kingdom
- Spoken Languages
- English
- Runtime
- 1h 52m
- Production Studios
- Video 125
Creative Leadership & Key Crew
Peter Middleton
Peter Middleton
Department Leadership Roster
Peter Middleton
Writer
Peter Middleton
Producer
Production Stills & Gallery
Official cinematic photography and background stills for The Old Gotthard Tunnel Route - Driver's Eye View.
More Like The Old Gotthard Tunnel Route - Driver's Eye View
Recommended titles matching themes, cast, and genres.












Frequently Asked Questions About The Old Gotthard Tunnel Route - Driver's Eye View
Quick factual answers about cast, synopsis, director, box office, and release information.
What is The Old Gotthard Tunnel Route - Driver's Eye View about?
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Who directed The Old Gotthard Tunnel Route - Driver's Eye View?
The Old Gotthard Tunnel Route - Driver's Eye View was directed by Not specified.
Who stars in The Old Gotthard Tunnel Route - Driver's Eye View?
The principal cast of The Old Gotthard Tunnel Route - Driver's Eye View includes Jonathan Kydd.
When was The Old Gotthard Tunnel Route - Driver's Eye View released and how long is it?
The Old Gotthard Tunnel Route - Driver's Eye View was released in 2018 with a total runtime of 1h 52m.
