
Grafton & Upton Railroad Volume Five
“Hopedale to Milford - Milford to Franklin”
Synopsis
The latest expansion for the G&U is the acquisition of the Milford Running track, that G&U now has operating rights from Franklin Forge to Milford. The G&U also rebuilt their mainline from Hopedale to Milford. We hop aboard a G&U MP15AC #1160 for a cab ride from Hopedale yard to Milford yard, then we reverse direction and head to Franklin. We then take the head end again and capture the Franklin to Milford on the Milford Running track (Leased from CSX / MBTA) Then we capture action from the ground as we chase the Hopedale to Milford and the Milford Running track! We also capture Foreign power of the G&U and MBTA detour trains!
Release History & Theatrical Window
03/12/2022
Physical Home Media
Key Information & Fast Facts
- Director
- —
- Original Title
- Grafton & Upton Railroad Volume Five
- Country of Origin
- United States of America
- Release Date
- 03/12/2022
- Spoken Languages
- English
- Runtime
- 1h 27m
- Production Studios
- Blackstone River Productions, J&O Railroad Productions
Creative Leadership & Key Crew
Shawn Invernizzi, Beth Steelton, Kayleigh Invernizzi
Department Leadership Roster
Shawn Invernizzi
Editor
Beth Steelton
Editor
Kayleigh Invernizzi
Editor
Age Classification & Content Advisories
Official viewer rating standards and content warnings across international classification boards.
NR: Not Rated — Evaluated outside standard classification boards.
International Certification Matrix
Not Rated — Evaluated outside standard classification boards.
Production Stills & Gallery
Official cinematic photography and background stills for Grafton & Upton Railroad Volume Five.
Similar Titles to Grafton & Upton Railroad Volume Five
Movies sharing stylistic DNA, tone, and thematic storytelling
More Like Grafton & Upton Railroad Volume Five
Recommended titles matching themes, cast, and genres.
Frequently Asked Questions About Grafton & Upton Railroad Volume Five
Quick factual answers about cast, synopsis, director, box office, and release information.
What is Grafton & Upton Railroad Volume Five about?
The latest expansion for the G&U is the acquisition of the Milford Running track, that G&U now has operating rights from Franklin Forge to Milford. The G&U also rebuilt their mainline from Hopedale to Milford. We hop aboard a G&U MP15AC #1160 for a cab ride from Hopedale yard to Milford yard, then we reverse direction and head to Franklin. We then take the head end again and capture the Franklin to Milford on the Milford Running track (Leased from CSX / MBTA) Then we capture action from the ground as we chase the Hopedale to Milford and the Milford Running track! We also capture Foreign power of the G&U and MBTA detour trains!
Who directed Grafton & Upton Railroad Volume Five?
Grafton & Upton Railroad Volume Five was directed by Not specified.
Who stars in Grafton & Upton Railroad Volume Five?
The principal cast of Grafton & Upton Railroad Volume Five includes Not specified.
When was Grafton & Upton Railroad Volume Five released and how long is it?
Grafton & Upton Railroad Volume Five was released in 2022 with a total runtime of 1h 27m.
What is the age rating and content advisory for Grafton & Upton Railroad Volume Five?
Grafton & Upton Railroad Volume Five holds official age classifications: US: NR (Not Rated — Evaluated outside standard classification boards.).































