Skip to content
Grafton & Upton Railroad Volume Five poster
NR03/12/20221h 27mUnited States of America

Grafton & Upton Railroad Volume Five

“Hopedale to Milford - Milford to Franklin”

Synopsis

The latest expansion for the G&U is the acquisition of the Milford Running track, that G&U now has operating rights from Franklin Forge to Milford. The G&U also rebuilt their mainline from Hopedale to Milford. We hop aboard a G&U MP15AC #1160 for a cab ride from Hopedale yard to Milford yard, then we reverse direction and head to Franklin. We then take the head end again and capture the Franklin to Milford on the Milford Running track (Leased from CSX / MBTA) Then we capture action from the ground as we chase the Hopedale to Milford and the Milford Running track! We also capture Foreign power of the G&U and MBTA detour trains!

Release History & Theatrical Window

4K UHD / Blu-ray Debut

03/12/2022

Physical Home Media

Key Information & Fast Facts

Director
—
Original Title
Grafton & Upton Railroad Volume Five
Country of Origin
United States of America
Release Date
03/12/2022
Spoken Languages
English
Runtime
1h 27m
Production Studios
Blackstone River Productions, J&O Railroad Productions

Creative Leadership & Key Crew

Film Editing

Shawn Invernizzi, Beth Steelton, Kayleigh Invernizzi

Department Leadership Roster

Shawn Invernizzi

Shawn Invernizzi

Editor

Beth Steelton

Editor

Kayleigh Invernizzi

Editor

Age Classification & Content Advisories

Official viewer rating standards and content warnings across international classification boards.

Primary: NR

NR: Not Rated — Evaluated outside standard classification boards.

International Certification Matrix

United States (MPAA)NR

Not Rated — Evaluated outside standard classification boards.

Official cinematic photography and background stills for Grafton & Upton Railroad Volume Five.

More Like Grafton & Upton Railroad Volume Five

Recommended titles matching themes, cast, and genres.

Frequently Asked Questions About Grafton & Upton Railroad Volume Five

Quick factual answers about cast, synopsis, director, box office, and release information.

What is Grafton & Upton Railroad Volume Five about?

The latest expansion for the G&U is the acquisition of the Milford Running track, that G&U now has operating rights from Franklin Forge to Milford. The G&U also rebuilt their mainline from Hopedale to Milford. We hop aboard a G&U MP15AC #1160 for a cab ride from Hopedale yard to Milford yard, then we reverse direction and head to Franklin. We then take the head end again and capture the Franklin to Milford on the Milford Running track (Leased from CSX / MBTA) Then we capture action from the ground as we chase the Hopedale to Milford and the Milford Running track! We also capture Foreign power of the G&U and MBTA detour trains!

Who directed Grafton & Upton Railroad Volume Five?

Grafton & Upton Railroad Volume Five was directed by Not specified.

Who stars in Grafton & Upton Railroad Volume Five?

The principal cast of Grafton & Upton Railroad Volume Five includes Not specified.

When was Grafton & Upton Railroad Volume Five released and how long is it?

Grafton & Upton Railroad Volume Five was released in 2022 with a total runtime of 1h 27m.

What is the age rating and content advisory for Grafton & Upton Railroad Volume Five?

Grafton & Upton Railroad Volume Five holds official age classifications: US: NR (Not Rated — Evaluated outside standard classification boards.).